MTE recently completed this 5 Rows of 8 Dropbed Linkwing for an Australian customer, purpose-built for heavy haulage operations in Australia and shipped to Brisbane.
Rated to 130,000kg GVM, this build combines MTE’s hydraulic Linkwing widening system with a 127mm dropbed, hydraulic suspension and internal hydraulic gooseneck. With the ability to widen from 2.5m to 4.27m, it provides a highly configurable platform for transporting large earthmoving machinery and specialised heavy loads.
Key Specifications
Configuration: 5 Rows of 8 Dropbed Linkwing
GVM: 130,000kg
Overall Deck Length: 13,820mm
Deck Length Behind Gooseneck: 12,520mm
Deck Width – Closed: 2,500mm
Deck Width – Open: 4,270mm
Locking Widths: 2.5m / 2.7m / 3.1m / 3.5m / 3.75m / 4.0m / 4.27m
Dropbed: 127mm
Normal Deck Height: 950mm
Lowered Deck Height: 820mm
Raised Deck Height: 1,060mm
Deck: Fully enclosed 10mm 690MPa high-tensile steel
Suspension: MTE hydraulic ball type
Gooseneck: Internal hydraulic
Ramps: 3,300mm × 1,050mm heavy-duty hydraulic
Hydraulic Supply: Kubota OC60 diesel power pack
Remote: 16-function remote
Container Capability: 20ft & 40ft containers at 2.7m deck width
.jpg)
.jpg)
.jpg)











